Application – adhesive packers


Application range

  • Dry building components
  • Building components that cannot / may not be drilled
  • Prestressed concrete
  • Low pressure injections up to e.g. 10 bar

Placing the adhesive packer

  • Roughen surface on both sides of the crack depending on the building component
  • Distance between packers depends on thickness of building component (normally: thickness of building component = distance between packers)
  • Keep the injection canal free by driving a greased steel pin in the crack
  • Apply insulating material on the adherend of packer, push packer over the steel pin and press it on the crack
  • Seal crack with insulating material also embedding adherend of adhesive packers
  • Apply insulating material up to 3 – 5 cm from the end of crack (deaeration)
  • Mount locking tappets and open them
  • Inject packer until injection material comes out of adjacent packer
  • Shut locking tappet
  • After injection material has cured remove packers and insulating material



Information

  • Adhesive packers of plastic or metal are available
  • The adhesive bonding joint between packer and building component is decisive
  • The adhesive pull strength of surface as well as the characteristics of the adhesive (insulating material) have an important effect on the injection pressure
  • No reduction of cross section – no disturbance of flow

Интернет Каталог

Техника для инъекции

Ihr Konto
Registrierung
Forgot your password?